KEYWORDS: Direct wafer bonding; MEMS; micro-electromechanical; systems; microfabrication; wafers, OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Human-Machine Interfaces;Sustainment;Trusted AI and Autonomy 5. (2003). KEYWORDS: Vision systems, artificial intelligence (AI), machine learning (ML), polarimetric imaging, anomaly detection, SWIR, drone detection, counter-UAV, OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Integrated Sensing and Cyber The GUI will be further modified based on the end-user requests. AN/ALE-47 countermeasures dispense system (CMDS). PHASE II: Build a hardware prototype and demonstrate DVE mitigation capability. There is a large market for see-through optical displays from Google Glass type Heads Up Display products that apply to the broad commercial market, to the same type of riflescope overlay being proposed for this effort that applies to the civilian sport shooting market. For multifunctional materials, present the expected net weight savings vs using commercially-available, single-function alternatives. https://saemobilus.sae.org/content/as5750a 1. https://breakingdefense.com/2021/10/army-nro-pioneer-direct-sat-imagery-downlink-in-scarlet-dragon/ Design and specifications should also consider direct downlink of novel and future capabilities, such as from commercial weather data vendors and National Aeronautics and Space Administration (NASA) satellites. Assess and demonstrate the Smart-warehouse technology prototype(s) are capable of technology maturity (TRL 4 -9) of Technology Readiness. REFERENCES: Modeling, simulation, or comparison to similar developments should be used to justify design decisions. Using active feedback, these circuits have been stabilized to approximately 10 ppm in a pristine, laboratory setting with small variations in temperature and minimal vibration [1]. can be applied and take advantage of continuous time systems. 4. (2019, October 29). The selected contractor must be able to acquire and maintain a secret level facility and Personnel Security Clearances. Parts, 99 (1961). (c) range and data budgets provided at range and over multi-hop mesh-networking scenarios; graceful degradation of useful notional payload information, Kovalev, V. Eichinger, W. (2004) Elastic Lidar: Theory, Practice and Analysis Methods. Characterization of the spatially anamorphic phenomenon and temporal fluctuations in high-speed, ultra-high pixels-per-inch liquid crystal on silicon phase modulator. Optics Express, 27(22), 2019, pp. A USN/USMC internal logistical constraint on the MW-14 6V alkaline batteries used to power the FLU-8B/P is that procurement control of the battery resides with Naval Sea Systems Command (NAVSEA) instead of Naval Air Systems Command (NAVAIR). The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. 1. ANSI/VITA 48.2 Mechanical Standard for VPX REDI Conduction Cooling. Advanced digital optical communications (2nd ed.). "Operators Manual for Instrument Set, Reconnaissance and Surveying (ENFIRE) AN/TKQ-5 (NSN: 6675-01-559-6558)," Army Publishing Directorate, 2009. Technology Readiness Assessments (TRAs): Assess and demonstrate the Smart-warehouse prototype(s) are capable of technology maturity (TRL 4-7) of Technology Readiness throughout Phase 2 and achieve Level (TRL) 7- 9 upon completion of Phase 2 for transition. Zheng, P., Xiao, F., Nguyen, P.H., Farinha, A., Kovac, M., Metamorphic aerial robot capable of mid-air shape morphing for rapid perching. Phase I of the topic should include design of the application specific electronics, identifying and negotiating with a trusted IC foundry for fabrication, and receiving the process design kit (PDK) from the foundry of choice. MIL-STD-704F w/CHANGE 1: Department of Defense interface standard: Aircraft electric power characteristics. Validation testing should be performed under relevant operating conditions including pressures, vibrations, humidity, and temperatures expected for the intended application. Existing connections include B-nuts, Rosan fittings, and two-piece elastomer seals with backing rings, which are susceptible to poor installation or disconnection during operation. 182, October 2022, pp. PHASE III DUAL USE APPLICATIONS: Complete final testing, and perform necessary integration and transition for use in landing/take-off operations with appropriate existing platforms and agencies, and future combat systems under development. A Phase III proposal should follow the same format as Phase II for the content, and format. Lucivero, V.G. Fractional separation builds upon this fundamental understanding by exploiting the difference in energy levels needed to uniquely separate two or more components in the mixture. The OEM or military platform will dictate what further testing is required for the hardware to be incorporated. 4. In DTRA Reachback, we have received numerous requests from COCOMs to model the blast injuries in different scenarios. If a plate is in good condition, the noise reflected off of the plate sounds like a chime, however a delaminated plate produces a thud sound. Department of Defense. Additionally, people are highly reluctant to install monitoring software (e.g., agents) on their personal device to allow the Army to determine the state of the device. Connection has failed or Pulse is unable to connect to the specified gateway. permits, a schematic should be developed of the image acquisition and reconstruction software methodology, identifying useful existing software or software to be programmed. Typically the goal of Phase II is to expand the number of NSNs and/or to build capability to expand capacity to better fulfill DLA requirements. SPIE 9976, Imaging Spectrometry XXI, 997604. ANSI / VITA 46.0 VPX Baseline Standard, and ANSI / VITA 48.2 Mechanical Standard for VPX REDI Conduction Cooling. DESCRIPTION: The Marine Corps through the Joint Intermediate Force Capabilities Office (JIFCO) is seeking to develop a sticky foam material that is capable of expanding and sticking to targets in order to non-lethally entangle, restrain, and disable them. https://onlinelibrary.wiley.com/doi/full/10.1002/cnm.2590; TRL 3) by the end of Phase I, it is expected that a pathway to TRL maturation will be achieved through Phase II, with the potential for integration with heterogeneous quantum entanglement distribution testbeds in Phase III. Phase II will also explore linkages to the Synthetic Training Environment (Synthetic Training Environment, 2021). In the past two years on-chip optical isolation in the C-band has been demonstrated for the first time in two separate approaches. OBJECTIVE: To develop a computational modeling tool to simulate human blast injuries in the battle field While RF has superior range because IR is attenuated by the atmosphere, IR has superior angular resolution because of its shorter wavelength. V. Ushakov, et al. Since Pulse Secure VPN requires a special environment (virtual machine) to run, the full package installation is only recommended for system administrators. Prototype testing and evaluation will be conducted at a government facility in which optimum functionality will be determined based on range, atmospheric conditions, and tactical scenario. 5, October 2021. DTIC. o Current VPN status Improved identification of the solution space of aerosol microphysical properties derived from the inversion of profiles of lidar optical data, part 1: theory. OBJECTIVE: Develop an active machine learning (ML) database to aid the Navy in the development of polymer matrix resins and composites that have low flammability. Given that the H-60 type, model, series (TMS) platform is widely used across multiple services (Navy, Army, Air Force, and Special Operations Command), the program plan for this effort calls for the use of the H-60 TMS as the testbed for flight demonstration of the system. Among other capabilities, this technology will enable integration of sensitive optical sources on photonic integrated circuits. Prototype Development: Using elements from Phase I and addressing DLA Distribution defined user requirements, functional requirements, and system requirements a prototype (s) is developed for Experimentation, Developmental Test and Evaluation (DT&E), Early Operational Assessment (EOA), and Initial Operational Test and Evaluation (IOT&E). This system is expected to support an internal payload of 150 lb (158.76 kg) in weight, have a length less than 15 ft (4.57 m), and an overall system mass less than 2000 lb (907.18 kg). (2) Near real-time response response and alarms, if necessary, in less than one minute of detector(s) on site Major areas to consider include, but are not limited to: power supply; required computer processing; size, weight, and location of components; and interaction with aircrew gear. Current commercial edge node imagery processing often takes longer than 15-20 minutes to complete. 1. Holder, E.Jeff. OBJECTIVE: Develop on-chip optical isolators at telecom wavelengths with a high isolation ratio, wide bandwidth, and low insertion loss. Note: The prospective contractor(s) must be U.S. owned and operated with no foreign influence as defined by DoD 5220.22-M, National Industrial Security Program Operating Manual, unless acceptable mitigating procedures can and have been implemented and approved by the Defense Counterintelligence Security Agency (DCSA). PHASE III DUAL USE APPLICATIONS: Develop hardened system architecture and complete the Risk Management Framework process to gain cybersecurity accreditation for system deployment. DESCRIPTION: The intent of this SBIR topic is to develop hasty gap crossing solutions that are transportable and deployed by tactical vehicles. Eliminating avoidable helicopter seating-related injuries to improve combat readiness and mission effectiveness [Paper presentation]. Institutional Review Board (IRB) determination as well as processing, submission, and review of all paperwork required for human subject use can be a lengthy process. M. Lipp, et al. Develop an ontological framework consisting of Scene Ontology and System Ontology for cross-domain contextual representation that enable rich context expressions and strong validation. Estimates of sensitivity, cost, required system load outs, and time for identification should be provided. McKee AC, ME Robinson, Military-related traumatic brain injury and neurodegeneration, Alzheimers Dement. Please see note in Description section. A code-signing certificate allows developers to digitally sign program's executablesso that Windows and end-users can verify that they have not been tampered with by a third party. Working Group 1. DESCRIPTION: A counter unmanned aerial system (C-UAS) that utilizes multiple sensors would have the ability to detect and track unmanned aerial vehicles (UAVs) using a variety of methods while minimizing nuisance detections to near zero. PHASE I: Design, develop, and demonstrate the feasibility of the proposed high-speed weapons system propelled by a selected propulsion technology to meet flyout requirements. 1. Functional Requirements: Offerors must define the functions of the Smart-warehouse and describe the functional inputs and outputs of the Smart-warehouse. PHASE II: Develop a prototype of the AR flight training system integrated into a Navy military training aircraft (e.g., T-45) capable of presenting in an aviators visual field accurate and dynamic digital entities. Research team shall provide 3 days of on-site training for the system. Develop manufacturing plans to facilitate transition to a UUV program of record. ***For information on the SAML SSO profiles, bindings, and protocols that we support, see Supported SAML SSO Profiles section in the PCS Administration Guide. PHASE III DUAL USE APPLICATIONS: Offer shall commercialize CTDSP technology for both government and commercial application spaces. Ideally, the Phase II system should be demonstrated at a cold-weather exercise, such as Arctic Edge or Cold Response. Work produced in Phase II may become classified. Develop an ISLs concept for a low latency secure data delivery capability between earth observation satellites and the Government. With respect to developed algorithms, the fusion of sensor data and applications in machine learning have the promise of increasing accuracy in self-driving vehicles, manufacturing processes, and improve decision-making processes. 6, p. 1951, Mar. With over 11148 carefully curated MCQs covering all the essential topics of the . 3. Adding additional sensors, such as additional cameras, LIDAR/RADAR, or SONAR is acceptable but cost and logistical burden will also be considered. I have to use a wide array of VPNs as each of my clients has their own particular one they use. Staying the Course Maintaining the Path to Advanced Marine Corps EMSO. Journal of Electromagnetic Dominance. Defense Science Board. The system should be operational with potential for revision due to logistics and user input. The data package should include detailed description of modeling, analysis, and simulation activity used to determine that the system will be capable of satisfying mission requirements. If Pulse is launched through the Pulse Launcher on Windows, Pulse Launcher handles the expired or revoked client certificates. PHASE II: Optimize design, fabricate, and demonstrate the prototype in a simulated aircraft maintenance environment. Go to the bottom of the page and click the DoD SBIR 23.2 tab. Generally, the approaches have failed to deliver robust and affordable solutions. System Integration Further, proposed efforts must be judged to be at a Technology and/or Manufacturing Readiness Level (TRL/MRL) 6 or less, but greater than TRL/MRL 3 to receive funding consideration. (i) operate at a submerged depth of less than or equal to 30 ft (9.14 m), The technology must be precise, accurate, and stable over a long product lifetime, capable of surviving shock, vibration, and radiation characteristic of space flight through a contested environment, as well as small, lightweight, and low in power dissipation. o Hyperlink to MANET radio GUI A description of the system's capabilities: The white paper should describe the system's capabilities, including its ability to detect and track UAVs, its ability to neutralize or redirect UAVs, and its ability to integrate with other existing systems. Combustion methodologies should focus on Navy-specific fuels (e.g., JP-5, JP-10, and RP-2). The official link for this solicitation is: Daler, L., Klaptocz, A., Briod, A., Sitti M., Floreano, D., A Perching Mechanism for Flying Robots Using a Fibre-Based Adhesive, IEEE International Conference on Robotics and Automation, Karlsruhe, Germany, May 2013. Laser power deposition must be demonstrated to not exceed FDA guidelines. Phase I proposals will NOT be accepted for this topic. .css('display', 'inline-block') Demonstrate the ability to integrate transition-specific content for initial training capability transition for use during live flight in a Navy military training aircraft. VI-709, doi: 10.1109/ICASSP.2003.1201780. OBJECTIVE: To develop a software solution to translate ground-based full-motion video (FMV) data collected by Engineer reconnaissance assets into a digital product that can be manipulated and analyzed to answer intelligence requirements and inform command decisions. (y) have an obvious visual indication for Built-in Test (BIT). A final integration with a quantum sensor and subsequent demonstration will be required. DOI: 10.1088/2515-7647/ab8a57 PHASE I: In Phase I, the investigation shall explore the underlying technologies used to enable an EM skin within the frequency range of 2-18 GHz. Demonstrate feasibility of meeting pressure, operating temperature, transfer efficiency, interfacial adhesion, tensile and elastic modulus, static and fatigue strength, elongation, and hardness properties against the threshold and goal targets provided by the Naval Air Warfare Center Aircraft Division (NAWCAD). endobj REFERENCES: Rev. Product Management Infantry Combat Equipment (PdM ICE). Note: NAVAIR will provide Phase I awardees with the appropriate guidance required for human research protocols to use while preparing their Phase II initial Proposal. 7. Trainer, T. M., Baum, J. V., Thompson, J. R., & Ghadiali, N. D. (1969). Deliver a report documenting the initial research activities under Phase 1 to document the initial concept. For example, an image/video dataset of at least 4000 collected images and frames for a case study is considered content rich. For the phase I effort, the offeror shall demonstrate the feasibility and performance benefits of RISC-V/seL4 co-design for Open Source, High Assurance Hardware and Software Co-Design. Offeror shall develop models, simulations, prototypes, etc. Go to the bottom of the page and click the DoD SBIR 23.2 tab. PHASE I: Design and develop initial improvements to high-fidelity models and surrogate/reduced order models to predict scramjet engine unstart and demonstrate feasibility. Once the whole server version is running, the individual employees will have access to download their client as per the instructions and credentials coming from the enterprise admins or the university. M. J. Snadden, J. M. McGuirk, P. Bouyer, K. G. Haritos, and M. A. Kasevich, Measurement of the Earth's Gravity Gradient with an Atom Interferometer-Based Gravity Gradiometer, Phys. Currently the USMC checks the hard armor plates on a regular basis before and after Marines use the plate in a combat or training environment. Trapped Ion Periodic Table. Y. Tsividis, "Event-Driven Data Acquisition and Digital Signal ProcessingA Tutorial", IEEE Transactions on Circuits and SystemsII: Express Briefs, Vol. please retry. This demonstration should focus specifically on: PHASE I: The main goal of Phase I is a feasibility study in the development of a portable ncLVSM device. 2004, pp. REFERENCES: o 3 x flexible radio antennas with horizontal and vertical polarization Please see note in the Description paragraph. * * I am not responsible for bricked devices, dead SD cards, Ebolation X, * thermonuclear war, or the current economic crisis. (c) provide connectivity and data transmission, meeting Navy cyber security requirements, Ideally, this sensor will have a clear path to commercialization, relying on few, if any, precision-machined components. Oil temperature monitoring capabilities should roll up to the complete sensor accuracy and sample rate requirements specified herein. Because this topic covers a wide range of frequencies and applications, no uniform set of metrics will apply to all situations. PMID: 27958480. PHASE I: Design a proof-of-concept for a lightweight, compact north-finding system capable of either standalone or platform-integrated operation. Specialized, expensive manufacturing techniques like a CMM can negatively impact the inspection process. Phys. 72-77, doi: 10.1109/LARS/SBR/WRE54079.2021.9605450. The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. 20. 36, pp. Incorporation of relevant physics for advanced hydrocarbon fuels (JP-5, JP-10, and RP-2) at supercritical/transcritical regimes is also important. Each analysis should also explore how best to train both diagnosis and treatment (e.g., part-task trainer, moulage on human standard patients, AR/VR/MR, or combinations). https://elearningindustry.com/augmented-reality-in-aviation-changing-face-sector-training-simulated-experience PHASE III DUAL USE APPLICATIONS: Maturing the prototype into a planned operational system which can be demonstrated in the operational environment. Currently, warehouse operations consume abundant amount of resources, i.e., time, human labor, paper, documentation, cost, data error, misplacement of material, bottle necks, etc. In the case of e-waste, this fundamental knowledge is lacking, and this program aims to address this need through advanced mathematical modeling (e.g., relative thermodynamic stability of multi-component mixtures, corrosion models, mechanical degradation models, etc.,), and apply this fundamental knowledge for fractional recovery of critical elements from e-waste. Such AI&ML algorithms are expected to be trained relatively quickly on low-cost GPUs to perform inference on GPUs in real-time. Considerable research has been conducted on possible systems that can create windows in a plasma layer for radio waves to be transmitted through [Refs 1,2]. (b) have a user interface that automates termini inspection and cleaning processes, Operators also require batteries that meet capacity to reduce the number of times that they switch batteries during missions and reducing the weight of carried items during missions. In an ASW exemplary use case, types of sonobuoys can include, but are not limited to, active and passive sonar capabilities to allow a wide swath of maritime area to be monitored and a greater magazine depth of sensors per Vertical Lift platform without the use of any tethered system traditionally used. Miniature air launched decoy (MALD) flight vehicle. 1. Mil Med 184(5-6) e233-41 (2019). PHASE II: Develop and deliver a prototype edge node image processing time reduction tool from concept development in Phase I. CISA recommends scanning computers and other devices with the Pulse Secure Integrity Tool to find out whether some of them have been exploited. Produce and deliver a final technical data package that includes system and subcomponent specifications, interface descriptions and definitions, and operating instructions for the prototype. Demonstrate capabilities potential for integration into existing ENFIRE hardware and workflows. Defense Logistics Agency Land and Maritime. 1. The production/manufacturing plan will need validation through modeling and simulation. The weapons system being sought is expected to sustain speeds higher than Mach 4.0, and have a minimum range of 350 nautical miles (648.2 km). Blumenthal, D., Photonic integration for UV to IR applications. 4. 1. A Microsoft LifeCam video camera and Ricoh G800SE digital camera capture imagery and focal length augmented by laser range finder distance measurements. . Aviation, space, and environmental medicine, 81(8), 774-778. https://doi.org/10.3357/ASEM.2736.2010 All image data must be compliant with DICOM standards. Currently, these devices have limited deployment due to factors such as the large SWaP, a lack of environmental robustness, and limited scalability. 128-134. https://www.researchgate.net/publication/322874001_A_Low_Cost_Solution_for_NOAA_Remote_Sensing/link/5a78de40aca2722e4df31a59/download 123-127, doi: 10.1109/TENGARSS48957.2019.8976056. Compared to existing classical approaches, they offer superior sensitivity and reduced size, weight, and power (SWaP). DESCRIPTION: United States weapons development has been dependent for years on large Prime Contractors providing the majority of the design, fabrication, and testing of new systems. 3. Addition of flame retardants provides a new variable as generally these decrease mechanical properties, though some types could enhance properties. The product of Phase I is a detailed report outlining the design, including modeling and simulation, and a detailed plan for fabrication. continue to achieve key performance parameters) in the presence of differential thermal contraction and other variations due to temperature dependent materials parameters of optical fibers, adjoining media, and QPICs. Prototype device will demonstrate ability to generate electromagnetic (EM) signals or EW capability that mimics realistic effects within training community objectives. PHASE III DUAL USE APPLICATIONS: During Phase III, the offeror will harden the system, ensuring it adheres to the latest Department of Defense cyber security requirements. The Navy seeks software development incorporating georectification techniques for commercial Low-earth Orbit (LEO) satellites that allow improved taskability of these sensors to support Naval missions, providing more tactically relevant information to the warfighter. https://www.darpa.mil/news-events/2017-04-10. https://www.vita.com/Standards Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement. 1. Integrate ISL solution across all future commercial earth observation satellites that are replenishing the constellation pending results from the prototype integration events. DESCRIPTION: Currently the USMC fields two different body armor protective plate solutions. In a case the previous year involving spinal-cord stimulators, Medtronic Inc. "/> These competing concerns drive the need for innovation in the componentry used throughout the system. Pulse Secure VPN users can't login due to expired certificate 2012;20:2234422359. Support the Navy for testing and validation to certify and qualify the capability for Navy use. DESCRIPTION: Signal intelligence (SIGINT) is the intelligence obtained by the interception of communications and electronic signals. - Pixel Bit Depth: > = 8 Bits KEYWORDS: rotary angle sensor; encoder; rotary resolver; capacitance encoder; optical encoder; inductive encoder; magnetic encoder; ultrasonic encoder, OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Microelectronics;Nuclear A.V. The device should demonstrate the integration of the fabricated photonically integrated circuit with the quantum sensor and display a path towards larger quantities of production. Harden when fully extended in 5-10 seconds 1. Blast Overpressure Induced Pulmonary and Intestinal Damage is Ameliorated by Post-injury Decay Accelerating Factor Injection. OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Space Technology;Trusted AI and Autonomy (2013). A survey on bias and fairness in machine learning. ACM Computing Surveys, Vol. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws. Work in Phase II may become classified. PHASE III DUAL USE APPLICATIONS: Support the Navy in transitioning the technology for use in wartime environment. Perform a study/analysis and show how the design should be able to fulfill the requirements. It was shown [4] that LDV with manual steering can record a patients Arterial Waveform (AWF) when signal is acquired from a body pulse point. Experimentally demonstrate that the prototype meets or exceeds the performance specifications stated in the Description. The responsible program office uses the Defense Language Institutes (DLI) Defense Language Proficiency Test (DLPT) Rating System with 3 Levels as established by the International Language Roundtable (ILR). Compare approach to existing manual and automated solutions. 627-634. KEYWORDS: Imagery Processing; Edge Node; Latency; Ground Processing; Imagery Exploitation; direct imagery delivery, OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Sustainment 2. I get an Untrusted Certificate error far too often, even when Im able to connect to the same server from the desktop version. Read and follow all of the DON SBIR 23.2 Direct to Phase II Broad Agency Announcement (BAA) Instructions. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws. During Phase 1, formats and resolution of data provided by current sensors within the ENFIRE system should be reviewed and assessed. Develop a plan for Phase III with a transition path to a program of record. Furthermore, these devices can augment inertial navigation systems by distinguishing between gravitational and inertial acceleration. Microsoft Research. With XR technologies improving exponentially, while also becoming cheaper, the traditional focus on the accumulation of flight hours to develop basic airmanship skills is no longer the optimal method to train effectively and efficiently, both in terms of quality and cost. The prototype will be evaluated to determine the capability meets performance goals defined in the Phase II development plan and the Navy requirements. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement.
How Many Mayors Were On The Andy Griffith Show, Articles P
pulse secure application launcher detected incorrect data from server 2023